Bruce finished off welding the starboard gunwales and crane mount and we mounted the crane.
![]() |
| Up she goes! |
![]() |
| Starting to swing her around |
![]() |
| Coping easily with my B.S.A.'s heavy forged steel girder frame |
![]() |
| Almost there |
The ins and outs of first time buying, blacking, moving, repairing, modifying and personalising a narrowboat pair, with a view to being able to live on them and be as self-sufficient and eco-friendly as limited funds allow.
![]() |
| Up she goes! |
![]() |
| Starting to swing her around |
![]() |
| Coping easily with my B.S.A.'s heavy forged steel girder frame |
![]() |
| Almost there |
![]() |
| The new crane assembled in my workshop, it will lift up to 1,000lbs and cost less than £150 ;o) I bought it here :- http://www.ebay.co.uk/itm/161482819970?_trksid=p2060778.m2749.l2649&ssPageName=STRK%3AMEBIDX%3AIT |
![]() |
| 1st mounting plate welded into the gunwhales, bolted the crane on and tested it by lifting my heavy Long-John delivery bike onto what is left of our tugdeck |
![]() |
| Removed the boards, Bruce will weld angle iron with the lip facing inboard then the boards will sit on that. I will replace the rockwool with thermal boards. |
![]() |
| The cratch collapsed, I was intending to replace it in hardwood, now I may have to do that a little sooner! HoHum! |
![]() |
| Where there should be gunwale there is fresh air! |
![]() |
| We learnt by past mistakes, covering the tarpaulins with plastic sheeting to keep the metal filings off, or they sit on the canvas until it rains, then cause rusty streaks! Grrrrr! |
![]() |
| There was not much metal left on the bits of gunwale that were there, I decided to replace it right back to the greenhouse. |
![]() |
| It had been painted black. |
![]() | |
| Whatever the paint was that he used, it was virtually indestructible! It would make good blacking methinks! |
![]() |
| Partially polished trumpet ;o) |
![]() |
| Probably mount it in front of the pidgeon box to reduce our headroom. |
![]() | |
| A panoramic pic of the new mooring with 23 FOTRN members beavering away. |
![]() |
| There are a few lumps of rock or concrete to shift, but Brian has negotiated the use of Clive's dredger which should make this easier. |
![]() |
| A well-earned tea break. |
![]() |
| After a nice evening moored on the new mooring the river had dropped about four inches, here NB Brass Buckle follows us to Blackthorn Lake Marina so that they can wait until the level drops. |
![]() |
| Shorty at the helm of Freyja & Christina |
| Glenda raising the guillotine at Ringstead Lower lock (photo by Shorty) |
| We never normally get any pictures with both of us in! So it was very nice to see this picture. (photo by Shorty) |
| We woke the next morning to a herd of curious cows, scratching their necks on our mooring pins. (photo by Shorty) |
| Approaching the A14 bridge at Thrapston, far more satisfying to potter under it than it is to drive stressed up on this busy trunk road. (photo by Shorty) |
| The disused Thrapston railway bridge and the non-existent Mill Marina. (photo by Shorty) |
| Approaching the Nine Arch Bridge at Thrapston, on a long line, on our return they went through OK breasted up. (photo by Shorty) |
![]() |
| We moored and winded below Titchmarsh lock |
![]() |
| It was a lovely day the next morning |
![]() |
| Moored on the 48 hour moorings, that lock landing has been closed for a while now. (photo by Glenda) |
![]() |
| In Tichmarsh lock (photo by Glenda) |
![]() |
| A nice moody shot of Thrapston (closed by Beeching!) railway bridge (photo by Glenda) |
![]() |
| We took it very easy on our way back upstream (photo by Glenda) |
![]() |
| In Denford lock (photo by Glenda) |
![]() |
| On Denford lock landing (while I checked out if the continuous moorer NB Dee was still hogging the prime mooring spot at Denford), it was! Grrr! |
![]() |
| Moored at Denford, Glenda made bread and had cooked us a 5 bird roast on the move! What a woman! ;o) |