Translate

Tuesday, 16 February 2016

Christina goes back into the water

The new lower tunnel bands will have a red panel in them with some trad flowers added.

The front tunnel bands re-lengthened and ready for the coloured centre panels and circles

I jet washed all the algae and bird crap off the tarpaulins the reproofed them.

I cut this rotten piece out and made a replacement piece out of oak.

Rolling back down into the lake, Barry is lowering her with the Matbro, Clive, the marina owner has the centre rope.

Safely moored up on the pump-out pontoon, waiting for Freyja to tow her back to our own pontoon.