We are making slow but sure progress

Once in drydock we enlisted the help of my old friend Sinc and set about stripping the flaky and rusty bits of the hull so that Glenda could treat it all with Fertan rust convertor.
Clive and Nene Marine's Mark set to stripping and removing the bits we wanted to repair or replace.
Sinc takes a break to catch and release a small fish from the caisson

Glenda applying Fertan, which is a great rust convertor

We also fitted a new Whale Gulper waste pump to the shower.
And I've stripped and started to clean the whole raw water system, we're stripping the many colours of paint and sand from the gunnels so we can re-paint and re-sand.

Woo Hoo! We got to move our motor (boat) again!

On our eventful trip from Cheshire to Northamptonshire we had an incident where a 'helpful' boater opened the lock paddles as I went to climb up the lock ladder, the boat shot backwards and crashed into the lock gates , bending the rudder.




So we claimed on our insurance and they agreed to pay for dry-docking and straightening the rudder.
Yesterday evening we breasted up to Clive the marina owner's boat and, once through the lock, we started our engine and moved to the dry-dock under our own steam (we have had a problem with our raw water cooling which is causing the engine to overheat after a while) but she managed to get us into the floating dry-dock without a problem.

 


We have pressure-washed the hull using Clive's monstrous Lister 4 pot jetwash! Not for the faint-hearted, next we power wirebrushed the loose stuff off and treated the hullsides with Fertan rust converter before we re-blacked. We did black her last September, but it was our first time and we didn't spend a lot of time on preparation.

Clive's 'Beast' a Lister 4 pot powered jet wash!

A strange sensation, being 'moored' but the floating drydock is constantly moving!

Freyja tucked up in the boat hospital

While the rudder is out for repair we will fit a new sealed steering stem bearing.
We will also fit a new cutlass bearing and stern gland (on the drive shaft)
Fit a new propshaft flexi-coupling
Get the engine re-aligned ( it is out of line at the moment, causing uneven wear on the drive shaft bearings)
 Cut the top off the diesel tank and clean all of the crap, water and diesel bug out (after having paid £190 to polish 50-70 litres!!!! Grrr!)
Cut an inspection panel in front of the engine bulkhead, so that we can get better access to the engine , which is very tight to the bulkhead, making it almost impossible to work on some parts of our engine.
Either fix our raw water cooling or re-connect the engine to the skin tanks (that are not being used at the moment). We think that raw water cooling is fine for rivers but prone to getting blocked by plastic bags etc. on canals.
We will also fit our new galvanic isolator and a 'Whale Gulper 220' waste water pump to the shower.