I managed to catch a train from Birmingham (where I was parked with crew from the Radio 1Xtra Live show) to Wellingborough, then cycled to Ringstead.
When I got there I found that Freyja was not landlined and the bilge pump was switched off, luckily the stern gland had been behaving itself for a change.
I measured up all of the canvas covers so that we could replace them, 12 sheets in all, we need to make them as weatherproof as possible before winter.
I didn't have time to fit the galvanic isolator or the bilge pump illuminated rocker switches (that won't get accidentally knocked off every time someone moves in cockpit)
We have a mountain of work to do. It would be quicker and easier to tell you what doesn't need fixing or replacing!
We need to :-
Fit new tarpaulins to try to make them a little more water tight
Overhaul or replace the engine
Check and repair or replace the engine header
De-grease and paint the engine bay (unless we find a cheap replacement engine, in which case we'll try to move it to it's own engine room)
If we keep the AMC 1800 engine I'll cut a sealable inspection panel, so we can get to the front and lower bits of the engine
Replace the cutlass bearing
Renew the stern gland packing
Re-fit the engine stop button
Fit the galvanic isolator
Replace the bilge switches with 3-way LED lit rockers
Fit another bilge pump under the floor in Christina
Fit rubber seals around the pidgeon box
Make a new control panel and replace any gauges, switches and lights that aren't working
A lot of the plywood and wood is rotten and needs replacing, I've already made new stern boards
Make a new Elum (butty rudder) to replace the rotten one
Make a new Tiller
Straighten the rudder on Freyja (got badly bent in a lock when a 'helpful' holiday boater opened the paddles fully with no warning!)
Fit PTFE bushes to rudder
Find fresh water leak in Freyja that keeps flooding the cabin
Fix blocked bath pump
Lift the floors, remove the pea shale ballast, de-rust and paint then replace with engineering bricks
Remove some of the rails and then replace the floor in Christina's store room
Take the interior doors off and make them fit properly
Re-fit the tunnel light and hand rails that parted company with the rotten plywood panels (and replace the panels)
Clean the diesel tank, lift pump and change the filter (again!!!!!), as we still seem to have problems even after polishing the diesel.
Sort out the electrics on Freyja and improve the wiring (get rid of choccie blocks etc.)
Free off the cratch hinges on Freyja and alter the steel cratch frame so that the cratch can be lowered for tunnels, and so Glenda can sit on the tug-deck
Renew the rotten greenhouse
Fix the leaky cabin doors
Fix the side hatch
Remove the sink from below the side hatch
Renew the leaky tug deck
Fix the heat exchanger on the range
Re-design the rear cabin in Freyja, fit a table and seating that will convert to another bed ( it is a bit of a mish mash, boatman's cabin that isn't a boatman's cabin.)
Fit a mains trickle charger and a new solar panel to Christina
Fit a new horn
Peg the top-boards to stop them moving
Properly attach centre ropes to Christina (not to the movable top planks or the rotten wood panels)
Make new centre rope cradles for Christina's top plank, incorporating rope 'handrails' (might stop me falling into another lock!)
Find a river anchor
Find another porta potti for Christina
Clean out the flues on the ranges and wood burner
Replace the rusty chimneys
Make and paint 2 boat hooks
Make and paint 2 poles
Make some new cross-straps
That's some of it, I can't remember everything we've found! HoHum!
As I said to some boaters on the way down
"Excuse me mate, is there a scrappy around here?"
"Why? What do you need?"
"Somewhere to put these! LOL!"
Seriously, we bought this pair knowing that we'd have our work cut out, it'll be worth it once they are sorted
The ins and outs of first time buying, blacking, moving, repairing, modifying and personalising a narrowboat pair, with a view to being able to live on them and be as self-sufficient and eco-friendly as limited funds allow.
Translate
Sunday, 18 November 2012
Wednesday, 24 October 2012
WooHoo!
Well, finally, Freyja & Christina are safely moored in Blackthorne Marina ;0)
Christina and Freyja safely moored and awaiting TLC
Glenda looking happy that we made it ;o)
A huge thank you to all that helped us through all the problems
Joe from Sudbury (R.I.P.)
Dave from Bay Photos
Gary
Clive at Willy Watts Marina
Tol at Willy Watts marina
RiverCanalRescue
Heritage spares
Cogenhoe Mill Marina
Red Bull Boatyard
Dave at Bay Photos took some great photos, click link below :-
Monday, 22 October 2012
So, so near, yet so, so far ;0(
I went to rejoin the boats at Billing lock near Northampton, Glenda brought her Dad, George, to see them. Dave and I replaced two rotten water pipes that were causing the header to lose coolant.
Someone had passed through the lock earlier and told Dave and Gary that the river was now open, it was late afternoon and I decided to try to get to Wellingborough.
We set off breasted up but quickly found it too difficult to negotiate the tight bends, so after ending up in the bank, we put Christina on a long line and made good progress until we approached Cogenhoe Mill lock, Glenda had told me to check the book before setting off, but not why, if I had read the warning to keep left then we wouldn't have been dragged into the marina by the current caused by an open flood gate. It was all we could do to avoid bashing anyone's boats.
They told us there was still a red flag up and we shouldn't be moving. But Dave the site man said we could moor there until the flood subsided.
A huge thank you to all at the Cogenhoe Mill Marina & leisure complex and for the great welcome we received at the site's Crow's Nest Bar. ;0) This turned out to be fortuitous, the boats were now safely moored on a site with very friendly people, so Dave and Gary could finally return to Wales.
A big thank you to both of them for looking after our boats ;0)
Someone had passed through the lock earlier and told Dave and Gary that the river was now open, it was late afternoon and I decided to try to get to Wellingborough.
We set off breasted up but quickly found it too difficult to negotiate the tight bends, so after ending up in the bank, we put Christina on a long line and made good progress until we approached Cogenhoe Mill lock, Glenda had told me to check the book before setting off, but not why, if I had read the warning to keep left then we wouldn't have been dragged into the marina by the current caused by an open flood gate. It was all we could do to avoid bashing anyone's boats.
They told us there was still a red flag up and we shouldn't be moving. But Dave the site man said we could moor there until the flood subsided.
A huge thank you to all at the Cogenhoe Mill Marina & leisure complex and for the great welcome we received at the site's Crow's Nest Bar. ;0) This turned out to be fortuitous, the boats were now safely moored on a site with very friendly people, so Dave and Gary could finally return to Wales.
A big thank you to both of them for looking after our boats ;0)
| Dinky Dave and Gary on our pontoon, spot the missing narrowboats! |
| Freyja and Christina moored in EA's Becketts Park Marina in Northampton. |
Wednesday, 17 October 2012
Freyja is going again ;0)
Here they are moored at EA's Northampton Marina Becketts Park. Huge thanks to Clive at Willy Watts for coming to the rescue
Also very glad we joined River Canal Rescue, they were great.
Also very glad we joined River Canal Rescue, they were great.
Monday, 15 October 2012
Almost made it
Well, we got as far as the Northampton Arm and Freyja stalled, now the starter is refusing to play. So, after bow-hauling and poling them both through the Rothersthorpe flight, they are now sitting awaiting repair and for the marina to arrange to move them on the final leg to Blackthorne Marina.
I'm very disappointed that, despite all the running repairs, we didn't get them to our moorings.
I'm very disappointed that, despite all the running repairs, we didn't get them to our moorings.
Friday, 12 October 2012
So near, yet so far ;0(
It has definitely been a learning curve, we are now broken down near Weedon Bec, raw water pump is on strike, changed the impeller, but still no water ;0( Apart from that we've struggled because the marina forgot that I told them to fill her up before they started her so they didn't drag a load of crap into the newly fitted filter so we've had to change the filter again and a new lift pump and clean the diesel bug crap off the lift pump filter.
The water pump fell off, the exhaust fell to bits, the solenoid caught fire and now the water pump is down, starting to feel a bit beaten by it all. Just hope River Canal Rescue can get us going again in the morning.
The water pump fell off, the exhaust fell to bits, the solenoid caught fire and now the water pump is down, starting to feel a bit beaten by it all. Just hope River Canal Rescue can get us going again in the morning.
Thursday, 4 October 2012
This is turning into a bit of a struggle LOL!
We left Aqueduct marina, Church Minshull on Monday afternoon & stopped the night at Kings Lock, in the morning she wouldn't start so waited until 9 am to find some easy start, then found the stop button was not returning, next night we stayed under the M6 at lock 57 on the T&M, early start and had many probs, engine started racing, throttle stopped working, crept along on tick over then racing again which caused the exhaust flexi to break and the water pump fell off!
So the marina had not done a great job of servicing it.
We struggled on bow-hauling both boats to lock 42 at Kidsgrove where Red Bull Services helped us out with bits to fix the exhaust. a great guy, very helpful.
We went to the Canal Tavern & the Blue Bell, where we met Brian off NB Alton, he agreed to drop of some coal at 7 o'clock next morning, he arrived with his good lady Anne Marie.
So the marina had not done a great job of servicing it.
We struggled on bow-hauling both boats to lock 42 at Kidsgrove where Red Bull Services helped us out with bits to fix the exhaust. a great guy, very helpful.
We went to the Canal Tavern & the Blue Bell, where we met Brian off NB Alton, he agreed to drop of some coal at 7 o'clock next morning, he arrived with his good lady Anne Marie.
At gone 2 o'clock we left to try to make the 3 o'clock deadline for the Harecastle tunnel, made it just, as did two other narrow boats, we waited for two others to come the other way, we followed the other two with no probs, but then the motor started to play up again, think the lift pump is dodgy, this caused us to run out of light in Stoke on Trent :0(
Early start in the morning, fingers crossed.
Early start in the morning, fingers crossed.